Anesthesia machine installation process
3Pages

{{requestButtons}}

Catalog excerpts

Anesthesia machine installation process - 1

Anesthesia machine installation process 1. Open the package 2. Anesthesia machine instalation (1)、Install wheels and poles Schematic diagram (2)Install the anesthesia machine and tighten the 4 screws. (3) Install evaporation tank a)、put the evaporator on the hanger. Lock switch Lock switch The "lock switch" is in this position and the installation is complete. b)、Rotate the "lock switch" 90° clockwise。 Schematic diagr

Open the catalog to page 1
Anesthesia machine installation process - 2

2、Pipeline connection steps (1)Anesthesia machine line connection: Exhaust gas discharge line Breathing circuit

Open the catalog to page 2
Anesthesia machine installation process - 3

4 、Soda lime replacement Turn the screw to replace the soda lime Note: The slot of the soda lime bucket must be aligned, otherwise it will be easy to leak

Open the catalog to page 3

All Bmv-vet catalogs and technical brochures

  1. BMO-210A Vet

    4 Pages

  2. MX5 Go

    4 Pages