1. Catalogs
  2. Genepro inc
  3. Vat Assembly Manual

Vat Assembly Manual
1 /7Pages

Vat Assembly Manual

Vat Assembly Manual
1 /7Pages

Catalog excerpts

Vat Assembly Manual-2

½" MNPT Fittiing 1” FNPT Fitting

 Open the catalog to page 2
Vat Assembly Manual-3

Rear of Controller Be Sure to fill the water jacket of the vat before connecting any cables to the controller. Thermowell Jack

 Open the catalog to page 3
Vat Assembly Manual-4

Vat Assembly Manual **Use Teflon tape (included) to wrap threads before each fitting is screwed in. 3/4” FNPT Fitting Sight Gauge Fittings 1/2” MNPT Fitting Attach 1/2” ball valve to 1/2” MNPT Fitting Attach Breather Plug to Elbow Fitting then to 3/4” FNPT Fitting

 Open the catalog to page 4
Vat Assembly Manual-5

Sight Gauge 3/8 Brass Fittings for Sight Gauge Attach to Vat With Gaskets on each side of Sight Gauge attach with bolts to the 3/8 brass fittings Sight Gauge with Gaskets and Bolts

 Open the catalog to page 5
Vat Assembly Manual-6

Heater Controls Mount the Thermowell to ½” FNPT Fitting Mount the heater to lower 1” FNPT fitting 3/8 ball valve & 3/8 plug

 Open the catalog to page 6
Vat Assembly Manual-7

Heater Controls Attach Plug to valve then to the 3/8 FNPT Fitting Attach the cords to appropriate plug -in followed and place it on the platform

 Open the catalog to page 7
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.