video corpo

BIO-LNG
1 /2Pages

BIO-LNG

BIO-LNG
1 /2Pages

Catalog excerpts

BIO-LNG-1

BIO-LNG PURIFICATION AND MICRO-LIQUEFACTION SYSTEM Caratteristiche: • Sistema integrato con polishing e liquefazione • Nessun fluido di processo e a contatto con parti meccaniche (scambiatore di calore, no compressore o JT-Valve) • Nessun vettore freddo circola all'esterno dell' apparecchiatura (minima perdita di calore) • Rimozione efficiente dei gas non condensabili (N2,02, H2, ecc.) • Possibility di integrazione con impianto di upgrading • Scalabile (consente di crescere / investire insieme alla domanda) • Elevata produttivita (>8.400 h/a), design intrinsecamente ridondante (multi-macchina) • Esperienza sul campo e ampia rete di assistenza in tutto il mondo (apparecchiature approvate da BV,ABS e USCG) Features: • Integrated system with polishing and liquefaction • No process fluid is in contact with mechanical parts (heat exchanger, no compressor or JT-Valve) • No cold vector circulates outside the equipment (minimum heat leak) • Efficient removal of non-condensable gases (N2, 02, H2, etc.) • Possibilities to integrate with biogas upgrading plant • Scalable for future growth (allows to grow/invest along with demand) • High uptime (>8.400 h/y) and intrinsically redundant design (no single machine) • Experience from the field and broad assistance network worldwide (equipment approved by BV,ABS and USCG) STIRLING CRYOGENICS • Low operating pressures from 6 to 20 barg while delivering LNG product at low pressures (LNG@ 2-4 barg or lower) • “Plug and play” and modular design • Standard modules from 1 and up to 20 tpd, others upon request • Energy efficiency: as low as 0,60 kWh/kg LNG

 Open the catalog to page 1
BIO-LNG-2

EXAMPLE CONFIGURATION Example of 5 tpd plant configuration: • LNG production capacity: 5 tpd • LNG delivery pressure: 2-4 barg (lower upon request) • Biomethane input: up to 300 Sm3/h • Biomethane inlet pressure: 6-18 barg • Power consumption (Stirling cycle): 0,62 kWh/kg • Power consumption (including chilled water): 0,89 kWh/kg • Fully automatic & unmanned Example of 9 tpd plant configuration: • LNG production capacity: 9 tpd • LNG delivery pressure: 2-4 barg (lower upon request) • Biomethane input: up to 540 Sm3/h • Biomethane inlet pressure: 6-18 barg • Power consumption (Stirling cycle):...

 Open the catalog to page 2

All HYSYTECH SRL catalogs and technical brochures

  1. H2 Genio

    2  Pages

  2. HYSYTECH

    20  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.