Tub Assemby Instructions
8Pages

{{requestButtons}}

Catalog excerpts

Tub Assemby Instructions - 1

Pearson Tub Assembly Instructions!

Open the catalog to page 1
Tub Assemby Instructions - 2

2 of 8 Note that the tub components are reversible so the tub can be set up either clockwise or counterclockwise. These instructions show a tub set up where the gate will swing clockwise. The center post is reversible such that it will work in either configuration if it is flipped over." We suggest you read completely through these instructions prior to starting to assemble the tub. " 1. Set the A frame approximately where it will end up (i.e. next to the alley)." 2. Lay the center pivot pipe down flat, away from where the tub will sit with the four, one inch pipes toward the side the...

Open the catalog to page 2
Tub Assemby Instructions - 3

3 of 8 4. Pull the radial pipe that is standing vertical. This stands the pivot pipe up and puts the radial pipes on the ground. " 5. Spread the radial pipes as shown for stability." 6. Place the three 7-foot uprights on the stub pipes at the end of the radial pipes with the 1/2 inch set screws at the bottom. There will be a tab at the top. There are three vertical uprights. Leave the fourth radial pipe open for the A frame. Don’t tighten the set screws yet." 7. Place the top radial pipes down through the collars on the pivot pipe and the end." 8. Install the top spreader pipes with the...

Open the catalog to page 3
Tub Assemby Instructions - 4

9. Install keeper bolts on both the top and bottom spreaders."

Open the catalog to page 4
Tub Assemby Instructions - 5

5 of 8 10. Place the A frame in position by placing the bottom collar over the stub pipe at the end of the remaining radial pipe." 11. Install the spreader onto the A-Frame."

Open the catalog to page 5
Tub Assemby Instructions - 6

6 of 8 12. Place the final top radial pipe down through the collar of the pivot pipe and the end with the bolt bracket down into the top of the collar on the A frame." 13. Install the outer top corner braces on as shown." 14. Pin the straight panel between the pivot pipe and the A frame by dropping four of the pins provided into the one inch pipes on the pivot pipe. Make sure smooth side is facing the inside of the tub toward the animals."

Open the catalog to page 6
Tub Assemby Instructions - 7

7 of 8 15. Start at the A frame and pin the three cleated panels to the uprights. The cleats should face the inside of the tub, toward the animals. "

Open the catalog to page 7
Tub Assemby Instructions - 8

16. Tighten the set screws on the uprights." 17. Bolt the 11-foot sweep gate to the hinges on the pivot pipe with four 1/2 inch bolts provided. Bolt the top hinge first, then lift the bottom hinge and bolt."

Open the catalog to page 8

All Pearson Livestocke Equipement catalogs and technical brochures