Catalog excerpts
OVERHEATING PROBE REPLACEMENT
Open the catalog to page 17 black clamps Screw-drivers Probe with red connector (spare part) www.tecoonline.com | www.tecous.com
Open the catalog to page 2Disconnect the chiller form power supply. Using the screw-driver, remove the screws indicated in the picture here below (n°16 screws).
Open the catalog to page 3Disconnect ground wire from the cover Remove the cover
Open the catalog to page 4Disconnect the RED probe connector from main board. Cut the black clamps inside the chiller that embrace the probe’s wire.
Open the catalog to page 5Proceed to cut all black clamps that embrace the probe’s wire. Extract the wire from circular passage.
Open the catalog to page 6- Cut the last black clamp that embrace the probe’s wire and copper pipe near condenser - Extract the probe and replace it
Open the catalog to page 7- Insert probe cable in circular passage - Connect new probe connector to main board - Take new seven black plastic clamps and pinch the probe’s cable with the other cables as it was at the beginning. - Place the chiller cover in its position and then place the sixteen screws to close the chiller. ATTENTION: remember to connect ground wire to the cover before closing the chiller.
Open the catalog to page 8All TECO S.r.l catalogs and technical brochures
-
HY R290
5 Pages
-
AQUARIUM CHILLERS
17 Pages
-
WATER PROBEREPLACEMENT
11 Pages
-
FAN BLADEREPLACEMENT
8 Pages
-
Aquarium Chiller
14 Pages