1. Catalogs
  2. Unia
  3. FENIX 3000/3; 3000/4; 3000/6; 4000/6
video corpo

FENIX 3000/3; 3000/4; 3000/6; 4000/6

FENIX 3000/3; 3000/4; 3000/6; 4000/6
1 / 28 PagesView full catalog

FENIX 3000/3; 3000/4; 3000/6; 4000/6

Product catalog summary
General Information
The UTS DRILL control system is designed for both manual and automatic control of sowing and hydraulic functions in agricultural machinery. It is essential to thoroughly read the user manual and adhere to safety instructions for efficient and safe operation.
Safety Guidelines
  • Read the user manual before operating the machine.
  • Deactivate automatic functions before leaving the vehicle cabin.
  • Keep children away from the equipment.
  • Do not modify the product without authorization.
  • Dispose of the product as electronic waste according to local regulations.
EU Declaration of Conformity
The machine complies with Directive 2014/30/EU and other relevant EU directives, ensuring it meets safety and health requirements.
Job Computer Functions
The ECU-MIDI seed drill job computer is an ISOBUS system that controls functions such as metering shaft monitoring, hydraulic functions, and blower speed. It retains machine-specific data even when the terminal is changed.
Control Assembly
The system includes a job computer, sensors, and ISOBUS connections. Sensors monitor positions and rotations for accurate operation.
Instructions for Seeding Functions
  • Connect the job computer to the tractor's ISOBUS terminal.
  • Switch on the job computer and monitor the work screen for machine status.
  • Perform hopper discharge and calibration tests as needed.
Hydraulic Functions Control
Manual and automatic modes are available for hydraulic control, with specific settings for time and workflow management.
Calibration Test Procedure
The calibration test requires the machine to be operational. Prepare the machine and metering drives as per the user manual, partially fill the hopper, and stop the machine and blower. Select the product and dispenser for calibration, enter the working speed and calibration factor, fill the metering grooves, and start the test. Weigh the applied seed, enter the weight, and confirm test accuracy by repeating until results are consistent.
Filling Metering Units
To avoid seedless spots, fill the metering grooves and wheels before starting. Use the pre-dosing function and wait for the symbol to disappear before starting a run.
Initiating and Stopping Sowing
Ensure the machine is lowered, metering units are filled, and the blower is at minimum speed before starting sowing. To stop, finish sowing and the screen will display "Work interrupted."
Blower Operation
The blower can be turned on or off during operation, with different symbols indicating its status. The blower's revolutions are set in the product menu.
Adjusting Desired Values
During operation, adjust the desired value for each product individually. Use function symbols to increase, decrease, or restore the desired value to 100%.
Process Path Creation
The job computer supports creating process paths by disconnecting sowing hoses. The process path rhythm is determined by the number of runs and can be configured on the work screen. Identify the type of machine and select the path rhythm based on calculations involving sprayer and seed drill widths.
Product Configuration
Configure products in the database by selecting the product, entering the type, control percentage, gear ratio, blower speed, and tolerance limits. Set alarms for hopper levels as needed.
Hydraulic Functions Control
In manual mode, hydraulic functions work only while the button is pressed. Functions include unfolding/folding arms, track markers, lifting/lowering the machine, pre-emergence markers, front-mounted drag, fertiliser beam, and cultivation section. The blower can also be turned on/off.
Specifications and Procedures
The UTS DRILL User Manual outlines the operation of the blower and automatic hydraulic control mode. The blower must be turned on and off manually, and it will not start unless the blower revolutions and operating ranges are set in the 'PRODUCT DATABASE' menu. The automatic hydraulic control mode, referred to as 'Auto', requires user activation each time the machine is started and stops automatically when the application is stopped.
Automatic Mode Operation
To initiate automatic mode, the machine must be unfolded and ready for operation. The user must confirm readiness on the display screen. Automatic functions include lifting markers, switching obstacle mode, and managing track markers. The manual mode allows for lifting/lowering without interrupting automatic functions.
Time Settings
For efficient operation, time settings for machine lifting, lowering, and marker unfolding/folding must be configured. These settings are adjusted based on the tractor's hydraulic pump capacity and are typically set once per tractor.
Workflow in Automatic Mode
The workflow involves setting the machine at the field's start, selecting marker unfolding, and managing the blower. The machine lowers and unfolds markers based on set times, and the blower operates continuously during work. At the field's end, the machine lifts, markers fold, and pre-emergence paths are managed.
Obstacle Avoidance
Automatic obstacle avoidance allows for marker folding when encountering obstacles. The user can switch markers if needed, and the system automatically manages marker folding and unfolding.
Final Information
Disassembly and decommissioning require proper waste management. The manufacturer is not liable for improper operation, unauthorized modifications, or incorrect seed selection. The owner is responsible for machine operation and maintenance, ensuring operator qualifications.
Warranty Terms and Conditions
The warranty covers defects due to material or production faults. Claims are void if the manual is not followed, unauthorized modifications are made, or improper storage and maintenance occur. Rubber and plastic components are only covered for material defects.
See more

Catalog excerpts

FENIX 3000/3; 3000/4; 3000/6; 4000/6-1

USER MANUAL Combination seed drill UTS DRILL control for: FENIX 3000/3; 3000/4; 3000/6; 4000/6 UNIA Sp. z o.o. Ul. Fabryczna 2, 49 – 301 BRZEG, POLAND Phone +48 77 444 45 86 | Service: + 48 77 444 45 11 | Read the User Manual and follow the safety instructions contained in it before operating the machine. To access the Parts Catalogue and Guarantee Card, scan the QR code on the machine type plate. Remember to register the guarantee or contact your dealer to do so.

 Open the catalog to page 1
FENIX 3000/3; 3000/4; 3000/6; 4000/6-3

UTS DRILL User Manual Read the User Manual carefully, and then familiarise yourself with the construction and operation of the control system and its assemblies. Accurate adherence to the instructions contained in this Manual will ensure long-term, efficient, trouble-free and safe operation. In case of any problems and doubts with the operation and use, please contact an authorized dealer or the manufacturer’s Sales Department. The technical safety requirements are only met if only original spare parts are used in the event of repair. ATTENTION: The User Manual for the UTS DRILL control is part...

 Open the catalog to page 3
FENIX 3000/3; 3000/4; 3000/6; 4000/6-4

UTS DRILL User Manual The manufacturer is not responsible for any damage to property or people resulting from non-compliance with the recommendations. All responsibility and risk associated with it rests with the user. The rules of use consistent with the intended use of the product also include compliance with all the conditions of use described by the manufacturer. Observe the recognized health and safety rules and other rules of safe work in industry, agriculture and the road code. Any modifications to the machine carried out by the user exclude the liability of the manufacturer. 1.4. Safety...

 Open the catalog to page 4
FENIX 3000/3; 3000/4; 3000/6; 4000/6-5

UTS DRILL User Manual Track marker control. Control of all hydraulic functions (lifting, folding, adjustments, fan). Control of process path valves. Pre-emergence path control. Start the calibration test via the test switch. Registering the speed and correct operation of machine elements. Blower speed monitoring. Monitoring of sowing, and the possibility of changing the dose during operation. 3.2. Control assembly. The system comprises the following components: • A job computer that is mounted on the seed drill and controls its operation. Signal splitter ISOBUS cable CAN connection Sensors ....

 Open the catalog to page 5
FENIX 3000/3; 3000/4; 3000/6; 4000/6-6

UTS DRILL User Manual Rotation sensors. (Hall generator) Schematic view Mounting angle Ring with magnets Capacitive sensors. The signal is sent when the flat top side of the sensor is covered, e.g. by seeds. Schematic view Flat top side of the sensor LED; indicates if the sensor is connected Capacitive sensor Wire clips Set screw for changing the switching distance

 Open the catalog to page 6
FENIX 3000/3; 3000/4; 3000/6; 4000/6-7

UTS DRILL User Manual INSTRUCTIONS FOR THE CONTROL OF THE SEEDING FUNCTIONS 1. Connecting the computer. To connect the job computer to the power supply and to the ISOBUS terminal, you must connect the ISOBUS cable to the ISOBUS connection on the tractor. 1. Take the ISOBUS cable for the job computer. 2. Unscrew the dust cap. 3. Insert the ISOBUS plug into the ISOBUS connection on the tractor. 4. Lock the plug. For Müller-Elektronik basic equipment, in order to do this, turn the plug clockwise. Depending on the design version, you must proceed differently with other ISOBUS basic equipment. 5....

 Open the catalog to page 7
FENIX 3000/3; 3000/4; 3000/6; 4000/6-8

UTS DRILL User Manual Structure of the seed drill work screen Information on metering drives Active additional functions Information about the condition of the drill Information on metering drives. In this area you can see: • • - dose applied to each connected metering drive. The number indicates the relevant metering drive. The current value appears here. - entered percentage change of the desired value. Information on the rows. In this area you can see: • Rows where the seed and fertiliser application is performed. Arrangement of process paths Information on additional functions. This area...

 Open the catalog to page 8
FENIX 3000/3; 3000/4; 3000/6; 4000/6-9

UTS DRILL User Manual - the hopper reports an alarm (grain/fertiliser level). - the machine is in the working position. Information on additional functions. In this area you can see: • - the current speed of the machine. - the current rotational speed of the blower. The number indicates which blower it applies to. - creation of a process path. - deactivation of the control of the process path creation system. Operation of the machine in the field. 3.1. Hopper discharge. If there are still residues in the hopper after work, the hopper can be emptied. Make sure that the sowing process is stopped:...

 Open the catalog to page 9
FENIX 3000/3; 3000/4; 3000/6; 4000/6-10

UTS DRILL User Manual 2. Select the product for which you want to perform a calibration test. 3. – press. The “Calibration test” screen appears. 4. Select the dispenser for which the calibration test is to be carried out (if the seed drill does not have the option to spread fertiliser, the selection will not be active). 5. In the input field below the text “Working speed” enter the speed at which the sowing run is to be carried out later. 6. Enter the calibration factor, if is known to you. For new products, the optimal calibration factor is calculated automatically. It is then advisable to carry...

 Open the catalog to page 10
FENIX 3000/3; 3000/4; 3000/6; 4000/6-11

UTS DRILL User Manual - start sowing. Stop sowing. - finish sowing. The work screen shows the message: “Work interrupted.” All metering drives are stopped. 3.6. Turning the blower on and off. The blower can be turned on or off during operation. A different function symbol appears on the work screen, depending on the current status. 1. - turn on the blower or - turn off the blower. Note: The value of the blower revolutions is entered in the product menu. 3.7. Adaptation of the desired value during operation. The desired value can be adjusted during operation. If you are working with several products,...

 Open the catalog to page 11
FENIX 3000/3; 3000/4; 3000/6; 4000/6-12

UTS DRILL User Manual Areas of the drill work screen that are important for creating process paths. A process path is created on the left side of the machine. A process path is created on the right side of the machine. Process path rhythm length Number of runs until the process path rhythm is repeated. Operation elements Meaning of symbols Function symbol Meaning Increases the run number. For example, to be able to continue working on the same run after leaving the field. This function symbol is only displayed when metering is stopped or the operating conditions are met. Reduces the run number....

 Open the catalog to page 12

All Unia catalogs and technical brochures

  1. MAX/MAX T

    30  Pages

  2. ARES L

    34  Pages

  3. POLONEZ

    16  Pages

  4. PLOW

    34  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.